+8615267115891

Visit Gordon At Middle East Energy 2025 To Explore The New Future Of Electrical Connectivity!

Apr 07, 2025

Gordon is waiting for you at booth 3-Z3.F51, ZA'ABEEL Hall, Dubai World Trade Center (DWTC) from April 7 to 9, 2025! As an "old friend" in the wire and cable accessories industry, we have brought a super complete product lineup this time, from bundling to protection, from identification to installation, a one-stop solution to your wiring problems!

 

Looking forward to your cooperation

Welcome To Our Booth No. : ZA'ABEEL Hall 3- Z3.F51
Middle East Energy 2025 Exhibition
Location of exhibition hall: Dubai World Trade Centre (DWTC)
Exhibition Datr: April 7th - April 9th 2025

 Booth No. : ZA'ABEEL Hall 3- Z3.F51

Come to the booth to see these "star products"

 

Nylon cable ties: flame retardant and high temperature resistant, available in various colors, lengths, and styles, easy to use for tying wires, tying pipes, and organizing wiring harnesses!

 

Stainless steel cable ties: can be used at the seaside, in the desert, and in chemical plants! 316L material is corrosion-resistant, will not rust in the wind and rain, and can be used for ten years!

 

Cable Glands: can connect large and small cables, waterproof, dustproof and vibration-proof, can be customized according to your needs, and special sizes can also be made!

 

Heat shrink tube: shrinks once baked, insulation and waterproofing are super convenient! New energy vehicles and charging piles are all using it, high temperature resistant and anti-aging!

 

Smart cable identification: scan the code to check information, power station maintenance no longer needs to turn over drawings, efficiency is directly maximized!

 

 

Gordon's small goal

 

We have been making wire accessories for 10 years, and we want to make wiring easier for everyone--

 

1. Reliable quality: let every cable tie stand the test

 

Certification Grand Slam: All products have passed CE, UL, and RoHS certifications.

Test to know: simulate 60℃ high temperature and 90% humidity environment in Dubai Desert Photovoltaic Power Station, and run continuously for 365 days without failure.

 

2. Fast delivery: no need to panic for urgent orders

 

Full link of sea, land and air: cooperate with DHL and Emirates SkyCargo, urgent orders are shipped by air, and ordinary orders are shipped by sea, covering Saudi Arabia, UAE, Oman and other countries.

24-hour online customer service: Chinese, English, and Arabic customer service are on duty in shifts to help you check orders and track logistics.

 

 

Environmental upgrade: green construction, starting with a cable tie

 

Gordon

Degradable black technology: research and development of plant-based nylon cable ties, which automatically decompose after being buried in the soil for 6 months. Dubai Palm Island project has used it to tie landscape light lines.

 

Ocean Rebirth Plan: Plastic waste salvaged from the Persian Gulf is transformed into raw materials for cable ducts. Every 1 ton of recycled plastic can make 2,000 meters of cable ducts, helping customers save 30% of costs.

 

 

Send Inquiry